Closing the Gap in Construction
DEFENCE
INFRASTRUCTURE
Defence Infrastructure
For over 30 years, Warlitj has been a trusted partner in delivering vital infrastructure solutions for Defence projects across Western Australia. Our team is equipped to deliver sustainable, cost-effective outcomes, supporting Defence in their complex technical missions.
Over the years, our Defence team has gained extensive experience, working on a wide range of projects—from capability enhancement and base redevelopment to asset management and specialised training facilities.
OUR CORE CAPABILITIES INCLUDE:
Base Redevelopment
Comprehensive design and construction services to modernise Defence bases.
Training Facilities
Expertise in constructing and refurbishing specialised training environments, including for Special Forces.
Asset Mangement
Strategic upgrades and maintenance of Defence assets to ensure operational readiness.
Sustainable Infrastructure
Environmentally responsible practices implemented in all Defence projects.
Complex Construction Solutions
Experience delivering highly technical projects, such as wharf extensions and facility upgrades.
Our proven track record across a diverse range of projects ensures that Warlitj consistently delivers on time and within budget. Our focus on safety, sustainability, and innovation makes us the preferred choice for Defence projects.
Project Focus
HMAS Stirling Armament Wharf Extension
Budget
$64,000,000
Problem
Extension of Armament Wharf at HMAS Stirling to accommodate new vessels.
Solution
Installation of new infrastructure to enhance the wharf’s ordnance loading capabilities.
The project involved extending the existing wharf to support the loading needs of the Royal Australian Navy’s Supply Class Replenishment Ships and Hunter Class Frigates. The installation of infrastructure was designed to meet Defence’s stringent technical and safety requirements, ensuring the project’s success while enhancing operational capacity.
Bindoon Special Forces Training Facility
Budget
$2,000,000
Problem
Aging infrastructure at Bindoon Special Forces Training Facility.
Solution
Refurbish buildings and infrastructure to bring them into compliance to the National Building Code.
The project included the refurbishment of key operational buildings, including the range control and ablutions buildings. Warlitj carefully scheduled the works and coordinated with various trades to avoid disrupting SAS Regiment training activities, including live firing exercises. The project was delivered on time and praised for maintaining operational readiness during construction.
Warlitj performed all tasks within set timeframes, causing no disruption to EMOS or Defence operations in the sensitive environment at Bindoon Special Forces Training Facility (BSTF). Range Control staff have praised their conduct on the range as exemplary, and EMOS technicians have similarly provided positive feedback on the works and the professional manner in which they were carried out.
Dejan Sirko, Regional PSS Coordinator, Defence Base Services
Bidyadanga Aboriginal Community La Grange Inc. commends Warlitj Pty Ltd for their outstanding leak detection and repair services. David Macdonald and his team delivered a professional service while respecting our cultural requirements. They communicated effectively with residents, providing clear updates about their work and ensuring adequate notification when water supply interruptions were necessary. The crew's efforts to engage with the community, including gifting baseball caps to children, fostered a positive experience. Warlitj demonstrated professionalism and respect throughout the project, and we look forward to collaborating with them again to enhance our water supply.”
Tania Baxter, Chief Executive Officer, Bidyadanga Aboriginal Community La Grange Inc.
Working with Warlitj on the HMAS Stirling Armament Wharf Extension was a great experience. Their commitment to delivering high-quality work was clear from the start. Not only did they complete the project on time, but they adhered to Defence’s stringent technical and safety requirements without missing a beat. Their attention to detail and professionalism were key factors in the project’s success, and the fact that they managed to deliver everything smoothly, without disrupting operations, was something our entire team really appreciated.
Ajay Shah, Project Manager, KBR Infrastructure