Closing the Gap in Construction
LATEST
PROJECTS
Latest Projects
- Warlitj designed the new bridge which included the complete structure design and calculations, create all necessary building approvals, diverting the current creek flow to facilitate installation of columns and bridge abutments, installation of new steel bridge beams and pouring a new concrete bridge deck and asphalting the approaches to the bridge and installation of handrails to match the existing design through out the park.
- Warlitj were able to complete the works to ensure that bridge was ready for several important events to be held at the park.
- Installation of new infrastructure to enhance the wharf’s ordnance loading capabilities.
- The project involved extending the existing wharf to support the loading needs of the Royal Australian Navy’s Supply Class Replenishment Ships and Hunter Class Frigates.
- The installation of infrastructure was designed to meet Defence’s stringent technical and safety requirements, ensuring the project’s success while enhancing operational capacity.
- Communities suffered poor water pressure affecting health and wellbeing of the communities.
- Communities completed to date include Bindi Bindi (Onslow), Gooda Binya (Marble Bar), Irrungadji (Nullagine), Ardayaloon, Beagle Bay, Djarindjin, Burringurrah, Mardiwah Loop, and Mowanjum.
- Successfully located the leaks and repairs of below ground piping with state-of-the-art leak detection equipment resulting signification increase in water pressure and considerable saving by reducing water loss throughout the communities.
- Project involved extending the existing main to a new location under Broun Ave including excavation of Broun Ave to install the new Water Corporation Main.
- The installation of the new water main requires strict adherence to Water Corporation Design Standards including disinfection, flushing of the new main, and new connections to a number of properties.
- Warlitj successfully complete the works within budget and on time, meeting all Water Corporations safety and design requirements.
- This Commercial Leak Mitigation Program was delivered to several corporate clients, including D’Orsogna, Crown Casino, Crown Metropol, Discovery Parks, Bethanie Waters Village, and others.
- The program focused on detecting leaks and reducing water loss, leading to significant savings in operational costs and improved system performance.
- The project included the refurbishment of key operational buildings, including the range control and ablutions buildings.
- Warlitj carefully scheduled the works and coordinated with various trades to avoid disrupting SAS Regiment training activities, including live firing exercises.
- The project was delivered on time and praised for maintaining operational readiness during construction.
Warlitj performed all tasks within set timeframes, causing no disruption to EMOS or Defence operations in the sensitive environment at Bindoon Special Forces Training Facility (BSTF). Range Control staff have praised their conduct on the range as exemplary, and EMOS technicians have similarly provided positive feedback on the works and the professional manner in which they were carried out.
Dejan Sirko, Regional PSS Coordinator, Defence Base Services
Bidyadanga Aboriginal Community La Grange Inc. commends Warlitj Pty Ltd for their outstanding leak detection and repair services. David Macdonald and his team delivered a professional service while respecting our cultural requirements. They communicated effectively with residents, providing clear updates about their work and ensuring adequate notification when water supply interruptions were necessary. The crew's efforts to engage with the community, including gifting baseball caps to children, fostered a positive experience. Warlitj demonstrated professionalism and respect throughout the project, and we look forward to collaborating with them again to enhance our water supply.”
Tania Baxter, Chief Executive Officer, Bidyadanga Aboriginal Community La Grange Inc.
Working with Warlitj on the HMAS Stirling Armament Wharf Extension was a great experience. Their commitment to delivering high-quality work was clear from the start. Not only did they complete the project on time, but they adhered to Defence’s stringent technical and safety requirements without missing a beat. Their attention to detail and professionalism were key factors in the project’s success, and the fact that they managed to deliver everything smoothly, without disrupting operations, was something our entire team really appreciated.
Ajay Shah, Project Manager, KBR Infrastructure